WTW delivered a self-contained control room in a 20 ft container—complete with vibration-isolating, self-leveling lifting platform—for ESA.
Delivered in late 2023, this unit integrates a climate-controlled workspace with up to three operator stations and a precision lifting platform that decouples the telescope from ground vibrations. The platform offers repositioning repeatability better than 0.002° and height-deviation under load below 0.1 mm. ESA installed and integrated its optical payload on site, benefiting from the container’s rugged, compact design, open interfaces, and turnkey readiness.